Ecowaste Industries Ltd. Ecowaste Industries Ltd. About Ecowaste Permitted Materials Recycling and Bioremediation Hours of Operation Location of Landfill
Ecowaste Industries Ltd. Ecowaste Industries Ltd. Ecowaste Industries Ltd. Ecowaste Industries Ltd.
Ecowaste Industries Ltd. Ecowaste Industries Ltd. Ecowaste Industries Ltd.
Font Size: 
Smaller Larger
Disposal Rates - Richmond Landfill
Disposal Rates
Yard Waste Rates & Conditions
Overweight Vehicle Policy
Volume Incentive Plan (VIP)
Permitted Materials at Richmond Landfill
Location of Landfill
Hours of Operation
Effective January 1, 2012

"VIP" means eligible for Volume Incentive Plan

  Base Rate
 HST 
 Total 

Public Drop Off:

     
Construction & Demolition Waste VIP (tonnes)
Minimum charge $25
$ 66.45
  $ 7.97
  $ 74.42
Clean Green® - segregated loads only (tonnes)
Minimum charge $15
$ 50.96
$ 6.11
$ 57.07
Gypsum (max load size 5yd3) (tonnes)
Minimum charge $35.   Important notice
$ 158.20
  $ 18.98
  $ 177.19
Concrete
Clean or light rebar/mesh (tonnes)
Minimum charge $25
$ 18.78
$ 2.25
$ 21.03
Appliances - Stoves, Dryers, Washing Machines
Free
   
Appliances - Fridges / Freezers
$ 8.93
$ 1.07
$ 10.00
Metals - clean
Free
   
Cardboard (Corrugated) - clean
Free
   

Construction & Demolition Waste (Commerical):

Construction Refuse VIP (tonnes)
Minimum charge $25
$ 66.45
 $ 7.97
 $ 74.42
Demolition Refuse VIP (tonnes)
Minimum charge $25
$ 66.45
 $ 7.97
 $ 74.42
Land Clearing Refuse VIP (tonnes)
Minimum charge $25
$ 66.45
 $ 7.97
  $ 74.42
Concrete - clean Tandem Axle (per box)
$ 25.00
 $ 3.00
 $ 28.00
Concrete - light rebar Tandem Axle (per box)
$ 90.00
 $ 10.80
 $ 100.80
Concrete - heavy rebar Tandem Axle (per box)
$ 130.00
 $ 15.60
 $ 145.60
Concrete - clean End Dump (per box)
$ 50.00
 $ 6.00
 $ 56.00
Concrete - light rebar End Dump (per box)
$ 180.00
 $ 21.60
 $ 201.60
Concrete - heavy rebar End Dump (per box)
$ 450.00
 $ 54.00
 $ 504.00

Roofing Materials:

Asphalt Roofing, Wood Roofing  (tonnes)
Minimum charge $25
$ 67.49
$ 8.10
$ 75.59
Clean Asphalt Shingles (tonnes)
$ 40.00
$ 4.80
$ 44.80

Insulation:

Loose Insulation - Batt Insulation (yd3)
Minimum charge $10
$ 10.55
$ 1.27
$ 11.81
Rigid Insulation - Styrofoam (yd3)
Minimum charge $15
$ 15.83
$ 1.84
$ 17.67

Wood:

Select Wood (price per load)
Maximum trailer size 75 cubic yards) *
$ 600.00
$ 72.00
$ 672.00
Treated Lumber (including Creosote) VIP (yd3)
Minimum charge $35
$ 32.70
$ 3.92
$ 36.62
Fire Damaged VIP (yd3)
Minimum charge $35
$ 32.70
$ 3.92
$ 36.62

Soils:

Dry Fill - Industrial Grade or Better (tonnes)
Minimum charge $20
$ 17.26
$ 2.07
$ 19.34
Yard Waste Rates & Conditions      


*
Call for approval before bringing to site.


Per cubic yard rates are based on the nominal size of the truck or container as established by Ecowaste. For further pricing information contact the office at (604) 276-9511. For size limitation on stumps and concrete see Permitted Materials.