Ecowaste Industries Ltd.
Richmond Landfill Operating Plan
Table of Contents
Title Page (PDF file, requires Adobe Acrobat)
Revision History
1. Introduction
2. The Company and Its Employees
2.1 History
2.1 Ownership
2.3 Job Descriptions
President
Office Manager
Site Superintendent
Gate Keeper
Operator
Salvager
3. Operational Certificates and Licences
4. Staff Training
5. Worker Safety
5.1 Industrial Health & Safety Regulations ("IHSR")
Harmful Substances and Containers
Protective Equipment
Machine and Equipment Safety
5.2 Occupational First Aid Regulations ("OFA")
First Aid Training
5.3 Workplace Hazardous Materials Information System Regulation
("WHMIS")
WHMIS Programs
WHMIS Controlled Products
Asbestos
6. Site Security
7. Gate House Operation
7.1 Checking Vehicles
7.2 Definitions of Refuse Types
7.3 Gypsum
7.4 Soils
7.4.1 General
Check List - Disposal of Soil
Sample - Acceptance of Soil for Disposal
(PDF file, requires Adobe Acrobat)
Sample - Acceptance of Soil for Remediation
(PDF file, requires Adobe Acrobat)
7.4.2 Special Procedures - Hazco Environmental Services Ltd. ("HAZCO")
HAZCO Waste Approval Application
(PDF file, requires Adobe Acrobat)
HAZCO Waste Soil Manifest for H, S, T and W Soils (4 pages)
(PDF file, requires Adobe Acrobat)
HAZCO Waste
Approval Application Procedure (PDF
file, requires Adobe Acrobat)
Receipt of
HAZCO Soils
7.5 Pricing
7.6 Volume of Loads
7.7 Calibration of Scale
7.8 Records Management
Soil Approvals
Removal and Water
Discharge Approvals
Site Superintendent
Copies
Pricing Memorandums, General
Information
8. Buffers, Berms and Boundary Conditions
9. Filling Methods
9.1 Operating Area - Dump Zone and Active Face
Inspection of Wastes
Compaction of Residual Waste
9.2 Cover Materials
10. Managing Waste
10.1 Rejected Waste
10.2 Recycling
10.3 Recovery of Special Waste
11. Soil Remediation
12. Storm Water Management
Storm Water Drainage (PDF file, requires Adobe Acrobat)
13. Environmental Controls and Monitoring
13.1 Leachate Control
Leachate Control, Flow
Direction and Discharge (PDF file,
requires Adobe Acrobat)
13.2 Leachate Treatment
13.3 Leachate Monitoring
13.4 Landfill Gas ("LFG") Management
13.5 Nuisance control
14. Composting
15. Contamination Control Procedures
16. Emergency Response
Emergency Response Contacts
Ecowaste Contact List (PDF file, requires Adobe Acrobat)
17. Fire Prevention and Control
17.1 Prevention Planning
17.2 Segregation of Combustible Materials
17.3 Allocation of Fire Extinguishing Materials
17.4 Emergency Response and Damage Control
Fire Signals and Control Methods
18. Contingency Plans - Special Waste Facility ("SWF")
18.1 Purpose
18.2 Emergency Response
Hazco Contact List (PDF file, requires Adobe Acrobat)
18.3 Fire Protection
Equipment Fire
Building Fire
18.4 Discovery of Unacceptable Waste
Response to Delivery of
Unacceptable Waste (SWF)
18.5 Contaminant Release
18.6 Severe Storms
Intense Rainfall / Rapid Snowmelt
Electrical Storms
Extreme Winds
18.7 Earthquake
18.8 Medical Emergencies
19. End Use and Property Development
20. Closure Plan - Landfill
21. Closure Plan - Special Waste Facility
22. Records and Reporting
Index of Permits and Regulations Requiring
Monitoring and Reports (PDF file,
requires Adobe Acrobat)
| © Ecowaste Industries Ltd. | April 6, 2005 |